Welcome to Electrical Certs Home |  | Contact Us
Electical Certs Home Electrical Testing Services Electrical Testing How We Work Electrical Testing Our Mission Electrical Testing Client Base Electrical Testing Client Area Electrical Testing News Electrical Testing Contact Us Electrical Certs
Electrical Certs Online Support
Electrical Certs
Home About Us Contact Us
Latest News
 Arrow August 2008 - Electricalcerts takes on new staff to meet the demands of existing clients
Arrow 
July 2008 - Electricalcerts launches new web site
 
 
Banner
 

Fixed Wiring Inspection Testing

Spacer

 

Electrical Mains Installation Testing & Emergency Lighting Testing


Periodic Inspection and Testing is offered in accordance with BS7671 (as amended). This means, in effect, that most systems require certifying every five years. In practical terms and to aid budget management, many of our customers now opt for a 100% visual inspection and 20% test of their installation every year.

Our Test Engineers


Senior Test Engineers are required to hold a City & Guilds 2360 (Parts I & II) certificate, or equivalent, at 16th Edition level of the IEE Wiring Regulations, together with a more advanced qualification, usually a City & Guilds 2391 (Inspection & Testing) Certificate.

Handheld Computer Technology


An advanced testing application, based upon a Windows platform, is now under development to expand the capability of a Psion programme introduced several years ago. The new programme offers benefits far in advance of any other product associated with electrical testing.

Periodic Inspection Reports


Reports are produced in NICEIC format. Consistent with the requirements of our Quality System, Category 1 failures are listed on a 4-part Failure Report that ensures the customer is advised of all dangerous faults without delay.

Local Authority Certification


Local authorities produce a range of documents requiring completion by an accredited test engineer. We will be pleased to help companies with this or any similar documentation.

Petrol Stations and Hazardous Areas


Should there be a requirement of this kind, we will be pleased to provide a suitably qualified engineer.

Repairs/Remedial Work


Each of our companies operates a separate, independently-managed Division to undertake remedial work. Duty engineers can be contacted 24-hours / 7 days-a-week.

Reporting


Fully detailed Test Results/Certificates are made available to our customers, usually within 15 working days of the Test Programme being completed.

Data Storage and Back-up


Separately from the written report, all test data is stored and managed electronically with a proper back-up facility.

Costs


Cost estimates are usually prepared for each individual site and will reflect the number of circuits to be tested, the availability of circuit data and the proportion of circuits to be tested outside normal office hours.

Where a large testing requirement exists, we will be able to agree an 'all-hours' rate per circuit to help with budgeting and planning. Should a customer have a large number of separate, smaller sites, testing costs are then based upon an agreed fee.
 
Electrical Testing Home | Services | How We Work | Our Mission | Client Base | Client Area | News | Contact Us

Copyright © 1994-2010 Electricalcerts.co.uk. All rights reserved.
Electrical Testing
Home About Us Contact Us